4 Main Steps Of Solar Installation
- Posted by adminsolar
- On August 31, 2020
- 0 Comments
Having solar panels in Arvada installed is a great way to lower your electricity bill while simultaneously helping the environment. There is a solar company in Arvada that can help install these on your property. The process is much more straightforward than you think. Many people think that when they want to have these installed, it can take almost a year, but this is not the case. Depending on the solar company in Firestone that you work with, you may have these up between one and three months.
All over America, people want to find ways to maximize the energy efficiency of their houses. While you can make efforts to change out your lightbulbs, watch the amount of trash you generate, and try to conserve electricity, these aren’t going to provide you with the same benefits as installing solar panels for your home in Frederick. If you want to take a productive stride towards making your house into a green building, you need to be harnessing the sun’s power. If you think the process is long and arduous, think again, it is relatively simple. If you work with the right business, they will efficiently have these systems up and running in no time so you can start using this renewable source of energy. The article below will outline four of the main steps involved with the installation of these systems.
Engineer Site Visit
For a system to be properly installed, your property needs first to be assessed by an engineer. This engineer may be an independent contractor or affiliated with the business you signed the contract with. Upon their arrival, they will want to assess your roof to see if it will be able to hold the paneling. They will also look at your electricity box to see it needs upgrading. In addition to the engineers’ visit, there may be a separate visit where the logistics of the actual installation will be worked out like the size of your roof and the angle that will be optimal for harnessing the sun’s power. After the engineer visit, it will be time to complete all the logistical paperwork associated with the installation.
Permit Acquisition
The beautiful thing about working with a professional business specializing in systems of this type is that they will take care of most of the paperwork on their own. While you may not have to do a lot of the document filing, it is still helpful to know what is happening. The primary paperwork that will be filled out is for the incentive applications available for people with these systems in their homes. There will be two main classes of incentive that you will apply for, state and federal. Some of the incentives commonly applied for are federal ITC, local initiatives that incentivize clean energy use, and financing for green initiatives such as PACE, other governmental rebates, and renewable energy certificates. Depending on where you live in the United States, the incentives that are going to be available will vary. In addition to this paperwork, you are going to have to acquire building permits.
Permit Acquisition
For these to be installed you need to get permits. The city and state you live in will determine the type of permits you need. If you live on a rural property, the permits you need will be different from living in a metropolitan hub. You may have to have a specific distance surrounding the system in one area, whereas some states allow you to cover your entire roof. The installer you work with will have all the knowledge regarding these permits and know how to navigate the application process correctly. In some cases, they may fill out most of the applications for you to make the installation more manageable.
Installation
Once you have your permits, the installer will consult with you to determine the type of equipment you want to order. You will choose the type of panel and inverter, as many brands and models have their own benefits and aesthetic qualities. Once the equipment has been chosen, your installation day will be right around the corner. Your roof will be prepared so that the racking can be appropriately attached. Each panel will then sit on the racking, and the proper electric wiring will be run into your home. Depending on the business you work with, it can take anywhere from one to three days. After everything has been installed, you will have to have the system approved by your local government you will be able to flip the switch and connect to the electric grid.
While each system’s scale will vary depending on the client, the process is generally the same. Things that will delay the installation process will relate to property reparations that need to be performed so that the structure of your home can adequately support the system. While it does take a bit of time to get everything ready, the benefits will be incomparable.
Once an engineer comes to your site to inspect your home and electrical box, the installer will then take steps to fill out the necessary paperwork. This paperwork will be crucial to you, taking advantage of the many incentives available all over the United States. With this paperwork filled out, it will be time to apply for city building permits to install the system according to zoning and building laws. With paperwork and permits in hand, your equipment will be ordered, and your installation will begin. In no time you will be connected to your city’s grid, and you will start reaping the rewards of the sun’s power.